Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online more than two weeks ago

Candidate

Male, 45 years, born on 16 June 1979

Not looking for a job

Atyrau, willing to relocate (Azerbaijan, Belarus, Georgia, Other regions, Kazakhstan, Kyrgyzstan, Russia, Uzbekistan, Ukraine), prepared for business trips

The approximate area of the job search is specified

Project Manager, Project engineer, Electrical Engineer

Specializations:
  • Sales manager, account manager

Employment: full time, part time, project work

Work schedule: full day, flexible schedule, remote working, rotation based work

Work experience 21 year 2 months

March 2019currently
6 years 1 month
Schneider Electric Kazakhstan

www.se.com/

Industrial Equipment, Machine Tools and Components... Show more

Tendering and Project Manager
As Tendering manager studying, analyze and evaluate the tender documents from a technical point of view to identify the risk factors, ensuring that technical terms comply with the relevant standards and coordinates with the Division Director, Vice president and General Manager for the overall risk assessment and bid decision. Providing support to Manufacturing plants during the pre-tender process starting from evaluating/ assessing tenders, assessing risk factors to arrive at bid decisions, and estimating all the required material, equipment, and manpower needs to be able to arrive at reliable cost estimates for bidding projects. As EPC Manager executing and deliver the project within an agreed time and budget, independently lead and manage the engineering function, coordinate and manage the design and Engineering works for an several EPC Projects with major clients such as TCO, NCOC, KPO etc. Managing the design issues during construction phase and ensure compliance with the client design.
December 2017March 2019
1 year 4 months
Bi-Engineering/Kazpaco

Atyrau, bi-group.org/

Construction, Real Estate, Architecture... Show more

Electrical Project/Package Engineer
Cargo Transportation Route (CaTRo) Project (Greenfield) in Kazakhstan will be located in the Prorva region on the northern shores of the Caspian Sea. The CaTRo transportation route will be suitable for heavy trucks carrying loads of up to 1800 tones. The plans call for a 70-kilometre-long canal connected to the Caspian Sea, as well as a 1300-metre-long quay including transfer and storage facilities. Duties: • Involved to Project in middle stage of Project. Assigned to organize and delivery the two major packages (7.3ml$ & 7.9ml$) in the Project which were late with fabrication for 8 month. Fabrication was re-organized and well managed at workshop, accordingly about 2500 documents issued and approved by client in short period. Packages safely delivered and installed at site. Technical support provided to Construction and Commissioning accordingly. • Involved to Construction, Pre-commissioning, Commissioning, Completion stages as Senior technical advisor, cleared the RFI, QA&QC incoming control, Technical queries, Punch list, Check sheets, QVD issues etc. at site. • Directly reported to Project Manager, Engineering Manager and Construction Managers
January 2017December 2017
1 year
Maerskoil Kazakhstan GmbH

Aktau, www.maersk.com

Oil and Gas... Show more

Senior Electrical Engineer/Technical Authority
Dunga Phase II Field Development Project (Upstream) – Project intension is to increase the crude production up to 30,000 bopd. Maersk Oil together with the partners have invested $1 billion to implement the Dunga FDP, under which the Company will drill 198 wells, upgrade the export, process and gas utilization facilities, Produced Water treatment, Injection Packages, construct 135 km of roads and build 180 km of new pipelines across 282 sq. km. Duties: • Technical authority support provided during the Construction/commissioning of the new Dunga gas turbine power plant, consisting of four Solar 60 (5.5MVA) gas turbine generators and associated 5.5kV to 35kV 16MBA transformers and switchgear. Two 35/10kV Dunga 2 and Dunga 4 Substations with 10MVA transformers. Water Injection Motors 1.2MW, wellhead motors. Trace Heating for Production and Injection lines; • Reviewed and approved the waivers, deviations from Maersk corp. standards IEC standards, implement the RoK, GOST and SNiP standards in Project; • Implemented the procedures, specifications and other documents related to construction and commissioning activities;
December 2015January 2017
1 year 2 months
KPJV Limited (Fluor, WorleyParsons, KGNT and KING)

Atyrau

Construction, Real Estate, Architecture... Show more

Electrical Department Deputy Manager
Future Growth Infrastructure Project (Greenfield) – Detailed Design (EPC). The FGP Project is the next planned major expansion of the existing facilities by TCO. The FGP intension is to increase the crude production by 12 million metric tons per year (260 MBOPD). Duties: • Shared the responsibility with Electrical Department Manager. Manage and organize the Electrical staff with 25 people to develop the engineering scope, design services and deliverables. Operated the team productivity within the approved time schedule. • Reported to Project Manager, Engineering Manager • Engineering scope of Early Works Project including two 35/10kV Tengiz 9A and New Camp Substations with 21MVA transformers, 11 Substations 10/0.4kV with auxiliaries and transformers. Construction Compound Area Detail Design including PMT office for 500 people, Canteen for 800people, Pump Houses, Security Posts, Warehouses, medical points, Aggregate area, Railway area, Batch Plant. Implemented the procedures, specifications and other documents related to construction and commissioning activities.
November 2013December 2015
2 years 2 months
KPJV Limited (Fluor, WorleyParsons, KGNT and KING)

Atyrau

Construction, Real Estate, Architecture... Show more

Lead Electrical, Senior Electrical Engineer
SGE CAR Project (Brownfield) – FEED, Detail design/Follow on design (EPC). The Capacity and Reliability (CAR) Project is part of the overall Second-Generation Enhancement (SGE) Project with an objective to increase capacity and improve reliability of the existing SGI/SGP plants to meet the optimize capacity 41,800TPD. Electrical scope contains: • Modification of 10kV, 660V, 380V MCC’s • Installation of new MCC’s • Detail Design and upgrade of Pump Houses, Steam Boiler Package, Air Coolers, Piperacks, Vessels, Tanks including Lighting, Earthing, Lightning, Trace Heating and Power design. Duties: • As technical expert supported the Procurement and design issues of Electrical part of Project. As Senior Package Engineer controlled, reviewed and approved the vendor and contractor documents • As Lead Electrical Engineer coordinated and supervised the Follow-on design team, supported the Construction and Commissioning issues and finalized the detailed design scope • Reported to Lead Electrical Engineer/Project Manager
April 2012November 2013
1 year 8 months
TOTAL E&P Russia

Moscow, total.com

Oil and Gas... Show more

Electrical Project Engineer
Kharyaga Third Field Development Phase (Upstream) Kharyaga oilfield. Modification and upgrade of Well Pads area (EP1/EP2/NP1) facilities and utilities. • As client representative managed the design contractor team and organization of Project from Electrical discipline. Detail Design with installation of following: 35kV Switchgear based on VCBs, 10MVA, 35/6.3kV Oil Transformers, 6kV Switchgear including VCB’s, 6kV MVD’s, 2.5MVA, 6.3/0.42kV Oil Transformers, 6kV SEHT Transformer, SEHT design (Water injection Line to CPF), HV (ESP) pumps power supply, Chemical Injection System including building, Diesel Oil System for Injection including building, Test Manifold and multiphase flowmeter etc • Coordinated and supervised the Electrical studies on Contribute to Tender Packages preparation, Technical Evaluations, Recommendations To Award etc. for selection of the Contractor(s) • Supervised and promoted the cost saving solutions for the plant design and site works • Managed the technical interfaces related to Electrical between Contracts, LLI’s … • Provided support to construction and commissioning activities related to Electrical scope
January 2012April 2012
4 months
Wood Group

Atyrau, www.woodplc.com/

Construction, Real Estate, Architecture... Show more

Senior Electrical Engineer
K3 WWU Project (Greenfield) - FEED and Early Works Design. TCO. Tengiz oilfield. Atyrau. Modification of Waste Water Units for KTL – Integrated Process Line and ETP - Effluent Treatment Plant areas. Tengiz Plant. Electrical scope: Installation of new 380V MCC to source the new DAF Building, ETP. 10/0.4kV, 630kVA Transformers, 380V MCC installation to supply the consumers in KTL Area. Upgrade of Lighting design, Trace Heating Design, Earting System, and Power Supply for Motors. SGP WHU Project (Greenfield) – FEED and Early Works Design. TCO. Tengiz oilfield. Atyrau. Modification of Water Handling Units for Waste Water Treatment Plant, Water Treatment Plant and Sour Water Stripper areas Tengiz Plant. Electrical scope: Power Supply from existing Substations. Installation of new cubicles and upgrade of existing Substations for each area. Upgrade of Lighting design, Trace Heating Design, Earting System, and Power Supply for Motors.
December 2009January 2012
2 years 2 months
Tecnomare ENI Group

Atyrau, www.tecnomare.it

Construction, Real Estate, Architecture... Show more

Senior Electrical Design Engineer
Kashagan Offshore Project. The project design includes building production hubs on platforms and artificial Islands to collect production, have an area 75x45km overall. Four 30MW power generators and three 2MW emergency generators installed to provide power Supply. Distribution of Power Supply carried out by one 35kV, fourteen 6kV, eleven 690V and more than sixty 400V Switchgears. Duties: • As technical expert supported the Procurement and design issues of Electrical part of Project. As Senior Package Engineer controlled, reviewed and approved the vendor and contractor documents • More than 1700 documents and drawings issued by our NWKC Electrical group during the Project.
October 2007December 2009
2 years 3 months
АО PSN Kazstroy

Atyrau, www.psnworld.com

Construction, Real Estate, Architecture... Show more

Electrical Engineer
TengizChevrOil (TCO) Projects CNSR Project (Greenfield) – Detail Design. TCO. Tengiz oilfield. Atyrau. Modification of Caustic Neutralization System Revamp. Tengiz Plant. NWPA Project (Greenfield) – Feed Design/Construction. TCO. Tengiz oilfield. GTS-144 FGLS Project (Brownfield) – Feed Design. TCO. Tengiz oilfield. Train 5 MSCOL Project (Brownfield) – Detail Design. TCO. Tengiz oilfield. D304 KTL-2.1 Project/ D304 KTL-2.2 Project (Brownfield) – Detail Design. TCO. Vessel Replacement. Tengiz oilfield. Karachaganak Petroleum Operations (KPO) Projects: Unit2 FGHM Project (Brownfield) – Feed Design. KPO. Karachaganak oilfield. Aksai. UGPP Project (Greenfield) – Feed and Detail Design. KPO. Karachaganak oilfield. Aksai.
February 2004September 2007
3 years 8 months
АО KEGOC

Atyrau, www.kegoc.kz

Power Industry... Show more

Electrical Engineer
Relay Protection and Automation Department. RP&A Design Group. Atyrau, Kazakhstan. KETR Project – Phase I. Kazakhstan Electricity Transmission Rehabilitation. Improve reliability and quality of power supply through rehabilitation of substations;

Skills

Skill proficiency levels
Умение расставлять приоритеты,
Умение работать в команде
Проактивность
Эффективное решение проблем
Способность к обучению
Техническая смекалка
Умение мотивировать людей
Организаторские навыки
Ведение переговоров
Microstation – Engineering skills
ETAP
ACAD, Microstation – Engineering skills
Smart Plant Review
Trace Calc Pro
DIALux
SAP, IMIS, EMDB, MIAP. Prodom, Documentum, POL

Driving experience

Own car

Driver's license category B, C, BE, CE

About me

Project Manager, Electrical Project Engineer with 16 years of experience in front-end and detailed design engineering, procurement, construction, commissioning and maintenance, has experienced in Major Oil & Gas company system such as Chevron, ENI, Total, Maerskoil, Fluor, Worley, Wood etc. - Acted as a technical authority, technical expert and manager (electrical) from client side for oil and gas projects. - Worked with high-profile international contractors to execute EPC and EP projects for Oil & Gas (onshore & offshore), Power Industries and Infrastructure - Held Project Manager, Senior, Lead, Deputy Department, Project Engineer roles in Electrical Engineering design, planning, engineering and coordinating with disciplines involved in the design and construction of both Greenfield and Brownfield projects in accordance with established project policies, schedules, budgets and procedures.

Portfolio

Higher education (master)

2006
Atyrau Oil & Gas Institute
Economics, Management
2003
Atyrau Oil & Gas Institute
Technology, Electrical Engineering, Power Supply of Industrial Enterprises and Cities

Languages

KazakhNative


Professional development, courses

2014
Project Management for Lead Engineer
Fluor Corporation, Lead Discipline
2006
Atyrau Institute of Oil & Gas
Management, Manager

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter