Renaissance Heavy Industries
Svobodny, rhi.ronesans.com/ru/,https://agpp-project.com
Construction, Real Estate, Architecture... Show more
Head of welding department, QA/QC manager, QA/QC engineer
Certificates:
CWI AWS, certificate № 23063461, till 01.06.2026
International Welding Engineer, Diploma № RU-IWE-0675-1
International Welding Inspector Comprehensive Level, Diploma № RU-IWI-C-0131-1
NOSTROY / НОСТРОЙ member, registry number: C-28-240894,
NOPRIZ / НОПРИЗ member, registry number: ПИ-137067
NAKS IV Level / НАКС IV уровень: GO (Gas Equipment) 1,2,2p,3,4,5,6,7; KO (Boiler equipment) 1,2,3,4,5; PTO (Lifting equipment) 1,2,3,4,5,6,7,8,9,10,11,12,13,14; MO (Metallurgy equipment) 1,2,3,4,5,6; NGDO (Oil and Gas production equipment) 1,2,3,4,5,6,8,9,10,11,12,13 with requirements of Gazprom pls.; OHNVP (Equipment of chemical, petrochemical, oil refinery and gas processing plants) 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16; GDO (Mining equipment) 1; OTOG (Dangerous cargo transpor-tation) 1,2,3; SK (Civil construction) 1,2,3,4; KSM (Bridge steel structures) 1,2 till 02.07.2026
NAKS III level: OHNVP p.1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16, SK p. 1,2,3,4, KO p. 1,2,3,4,5, till 16.01.2022 г.
VT, PT, MT, UT, RT: p. 1, 2, 3, 4, 6, 7, 8, 11, 12 till 25.06.2024
LT: p. 1, 2, 3, 4, 6, 7, 8, 11 till 30.07.2021
Acoustic-emission Testing: p. 1,2,3,4,6,7,8,11,12 till 14.01.2025
Rostechnadzor safety rules certificate
Certificate for working at heights till 04.03.2027
Responsibilities:
- responsibilities of the Head of welding department, QA/QC Manager, QA/QC Engineer of welding de-partment of Renaissance Heavy Industries branch at construction site of Amur Gas Processing Plant, project P3 of Maire Tecnimont Spa, www.agpp-project.com, General contractor NIPIGAS, Customer Gazprom pls, Amur region, Russian Federation.
- All possible issues regarding welding;
- operating management of welding department of Renaissance Heavy Industries branch at construction site of Amur Gas Processing Plant;
- welding regulatory documentation analysis;
- analysis of required welding technologies needed to perform all welding tasks faced by Company at construction site of Amur Gas Processing Plant;
- analysis of all range of welding technologies which will be used at project to be subjected to certifica-tion at NAKS (process piping ASME B31.3, GOST 32569-2013, BPV, API tanks, steel structures, plas-tic piping, reinforcement bar etc.);
- certification at NAKS of welding technologies, welding engineers, inspectors, welders, welding equipment, welding consumables;
- technological readiness for welding production;
- providing with all technological documentation regarding welding;
- quality assurance;
- quality control;
- welding consumables consumption calculations;
- punch list, NCR, corrective actions;
- site inspections (erection, assembly, welding, PWHT, NDT);
- WPQR (ASME BPVC Sec. IX, ASME B31.3);
- welders performance qualification testing for construction of Amur Gas Processing Plant;
- welders list;
- WPS (ASME Sec. IX, ASME B31.3) and various Russian Standards;
- NDT and DT
- production progress
- welders tool-box
- welding meetings with designer, general contractor and customer (Maire Tecnimont Spa, NIPIGAS, Gazprom)