Больше информации по резюме будет доступно после регистрации

Зарегистрироваться

Candidate

Male, 46 years, born on 15 April 1978

Saint Petersburg, willing to relocate (Azerbaijan, Belarus, Georgia, Other regions, Kazakhstan, Kyrgyzstan, Russia, Uzbekistan, Ukraine), prepared for business trips

Project coordinator

3 500 $ in hand

Specializations:
  • Sales manager, account manager

Employment: full time, project work

Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work

Work experience 25 years 6 months

September 2016currently
8 years 7 months
Renaissance Constructions, St. Petersburg, Russia
Project coordinator
• Controlling and Monitoring of Working Documentations, RFI, MAF, SAF and follow the shop drawings and IFC process. • Interpreting and examination drawings, tender documents. • Coordinate and involve in design, shop drawings approval, fabrication, testing etc. • Verifying Method statement for installation of equipment’s with quality inspection checklists. at various stages of work. • Interaction with subcontractors and guiding them the actual project requirements & specifications. • Prepare daily, weekly and monthly project reports for corporate management. • Accountability to the project team in fulfilling the contractual objectives with respect to planning and scheduling. • Maintain master plan / schedule and identify the impact of work performed and not performed. • Interfaced with operations, owners, suppliers and sub contractors to discuss impact of work and resolution of problems. • Extracted and summarised relevant contract requirements from the contract documents related to the project schedule contractual start and end dates, key milestone dates, owner involvement and special clauses. • Evaluate the estimated cost reports to support the projects control objectives and contractual requirements. • Ensure that signed contracts are communicated to all relevant parties to provide contract visibility and awareness, interpretation to support implementation. • Monitoring Installation of BMU system. • Monitoring manpower on site for installation of BMU system. • Prevent fatal accidents on site by enforcement works are executed "according to health and safety rules"
August 2014August 2016
2 years 1 month
Alfara’a - Belgium Aluminium And Glass, Abu Dhabi, UAE
Technical coordinator Architectural Metal Works, Facade & BMU Systems
Maintain the various registers and records as required by the PQP, and Contractual requirements • Provide Monthly Project reports for Corporate Management • Preparing Design visualizations in 3D studio Max for various systems depends up on the project requirement. • Submittals & Approvals: Preparing Technical & Material Submittals for various projects • 3rd Party Interaction: Interface with Consultants / Client / Third Party’s for related inspection activities & Collating (and where necessary conducting) field and laboratory tests. • Quality Assurance & Control: Ensure all the drawings are in latest revision.
September 2011July 2014
2 years 11 months
KC FAÇADE ACCESS SYSTEMS, Chennai, India;
Engineering Coordinator
• Assist Project Manager in installation procedures, preparing method statement & contractual requirements. • Coordinating all day to day activities • Coordination with consultant, client, Main Contractor & sub-contractors, Arranging & forecasting of manpower, material, tools & machineries as per project requirement. • Follow up the site staff to complete the project as per schedule & in budget cost. • Ensuring safety & quality as per the company standards, Assigning & monitoring task to the site staff, report
November 2009August 2011
1 year 10 months
MDL Technologies, Visakhapatnam, India
Assistant Engineer, HOD
• Production planning and control • Resource Planning & Deployment • Production Improvement • Material management
March 1998March 2008
10 years 1 month
Noratel India Pvt. Ltd. Technopark, Trivandrum, India
Technical supervisor,
• Production planning and control: Adapting process improvement measures to maximize capacity utilization and setting up production targets and achieving planned production targets. • Resource Planning & Deployment: Effective resource planning for optimizing man & machine utilization. Addressing personal related issues for escalating productivity and operational efficiency and imparting continuous training and discipline among the team. • Material management: preparing the material requirement as per production floor needs. • Quality Assurance& Control: Incoming Material inspection, In Process inspection, raising NCR’s.

Skills

Skill proficiency levels
MS Outlook
3ds Max
MS Project Expert
Adobe Photoshop
AutoCAD
Project management
Architectural Metal Works
Building Maintenance Unit (BMU's)
MS Office

About me

An experienced Engineer for Project coordination in the field of BMU, Curtain wall, stainless Steel fabrication and Production facilities with expertise in competitive technical and team management. • Hands on exposure in Design coordination, Resource planning, Deployment, Quality Assurance and Control. • Experience liaising with top Consultants, Engineers and Contractors namely Samsung C&T, AECOM, WSP, EC Harris International, BAM international, Arabtec, Sanjose, Oger etc… • Reviewing Technical documents such as Drawings, Method Statement, Material Submittals, Test Plans, Check lists, Risk Assessment etc…based on the contract and Specifications. • Preparing Project Presentations. • Well versed with ISO 9001: 2008; ISO 14001 / OHSAS 18001; 5s system Kaizen, LEED & Estidama. • Familiar with the International codes & standards (ASTM, AISI, BS) • Well versed with Aconex Documentation system.

Higher education

2009
National Institute of Engineering, India
Engineering, Electronics Engineering

Languages

HindiNative


EnglishC2 — Proficiency


RussianA1 — Basic


Citizenship, travel time to work

Citizenship: India

Permission to work: Russia

Desired travel time to work: Doesn't matter