Mechanical construction, commissioning, maintenance and preservation engineer

6 000 $ in hand

Specializations:
  • Other

Employment type: full time, part time, project work/one-time assignment

Work experience 22 years 3 months

June 2017currently
8 years 10 months
BP

Azerbaijan, www.bp.com/en/global/corporate/media/press-releases/second-shah-deniz-two-jacket-sailaway.html

Mechanical Engineer, offshore facilities installations
Engineering interface with Construction Management Contractor Liaison with and guidance to Contractor’s Mechanical Engineering department Technical liaison between the engineering, CLIENT construction and Contractor Management of mechanical engineering and project execution questions, change and resolution Ensure a commitment to best HSSE performance by mechanical team for CLIENT and for contractor and contractor’s workforce Establish technical and installation engineering routine and allied integrity process with deck build contractor construction mechanical engineer and construction supervisors. Participate in equipment lifting and installation risk assessments held by contractor. Participate in daily tool box talks on work site safety behaviour and hazard mitigation. Lead CLIENT’s expectations on quality and integrity in mechanical installation for deck build Agree with contractor’s mechanical engineer the work pack scheduling for equipment installation and fixing Assist contractor’s national recruitment strategy for mobilisation of mechanical engineers Participate in CLIENT Construction group risk register & Lessons Learned activities Engage in technical interface between design engineering contractor and CLIENT Construction Management Team Ensure along with C & EA teams that Azeri Authority approvals are achieved Ensure LLs from COP project are included in contractor mechanical installation schedule At site, ensure the construction effort is being applied in accordance with project schedule. Assist in the development of the Mechanical Completion execution plan for contractor deck build and yard completion. Deliver installation reports and ensure that the contracts’ SOW includes learning from constructability issues Inspect quality and integrity of mechanical equipment on arrival at contractor’s stores or warehouse (goods inward inspection). Witness and review installation of mechanical equipment & plant on the decks of QU & PR Report on any non-conformance identified at either goods receipt or at equipment installation. Agree and monitor ROS dates with E & P and ensuring the contracts SOW account for the dates Manage the clarification of Contractor requests for change in scope, or for design engineering introduced change through a robust MOC process Monitor Contractor’s progress and assist in achieving best productivity for work done.
January 2015June 2017
2 years 6 months
BP

Azerbaijan, www.bp.com/en_az/caspian/operationsprojects/Shahdeniz/SDstage2.html

Oil and Gas... Show more

Lead preservation engineer
Position: Preservation/cleanliness engineer - from 30 April 2016 nominated to the position of preservation lead Project: Shah Deniz Stage 2, around $28 billion in capital investment Key Responsibilities: * Engage with Management, Engineering, Operations & Commissioning to establish expectations and requirements. ; * Provide coaching / mentor national and junior team members as necessary ; * Engage with the engineering team to ensure preservation requirements are clearly identified * Take ownership of and develop the preservation philosophy and strategy. * Develop suite of preservation checklists, routines and procedures consistent with the preservation philosophy and Strategy * Review available databases / systems for monitoring and control of preservation regime, recommend and implement optimal system * Identify and procure any additional resources / skills required to implement strategy / administer the database etc. * Review and ensure that preservation requirements are included on Requisitions / Supplier RFQ's etc: * Review Supplier documentation and ensure that engineering have confirmed that preservation requirements are adequate * Ensure that all Supplier recommendations and requirements are incorporated into preservation procedures and project program. * Liaise with Engineering to determine preservation requirements for non-skid mounted plant & equipment. * Liaise with Engineering / Vendors / Contractors to determine possible access and optimal preservation regime for all plant and equipment. * Ensure Preservation activities are adequately estimated and allowed for within the project integrated plans / Contractors schedules etc. * Liaise with Commissioning to ensure that critical preservation is not compromised by commissioning testing / procedures * Liaise with System Handover Management Process (SHMP) co-ordinator to establish comprehensive Tag Database and ensure consistency between databases. * Attend / be represented at IRN's for major equipment to ensure correct preservation is applied and preservation regime for on-going project requirements is fully understood. * Manage and audit Fabricator Resources to ensure de-preservation / re-preservation is properly implemented and recorded: On receipt at fabrication yard / construction site On installation During Commissioning * Manage and control use, storage and safe disposal of preservation chemicals and materials. * Identify and manage resources for preservation activities during long term storage / transportation * Report on Preservation status, progress, outstanding work etc as required by Management. * Present Preservation records at points of handover - construction to commissioning and commissioning to operations. * Develop methodology to ensure preservation history of plant and equipment is transferred effectively into a system where it can be retrieved by operations. * Record Lessons Learned during Project cycle for future use. ;
January 2014January 2015
1 year 1 month
Caspian Pipe Coatings & Brederoshaw

Azerbaijan, caspianpipecoatings.com/eng/director.html

Industrial Equipment, Machine Tools and Components... Show more

Plant lead maintenance mechanical engineer
, CPC (Caspian Pipe Coating) plant in previous UPEC maintenance team Key Responsibilities: Work with the customer Bredero Shaw to assist in scope development, troubleshooting, process improvement, and general technical assistance when called upon. Estimating of new construction, minor repair, major repair projects, including engineering, materials and labor estimates for mechanical systems. Interface with other disciplines to ensure seamless design integration. Site assistance during troubleshooting, major repairs, or new construction in the area of mechanical system replacement, modification Coordination of work with other disciplines
January 2011January 2014
3 years 1 month
BP

Azerbaijan, www.bp.com/en_az/caspian/press/pressreleases/West-Chirag-topsides-successfully-installed-offshore.html

Construction, Real Estate, Architecture... Show more

Topside construction mechanical engineer
, Intertek Position: Mechanical engineer, construction team Project: West Chirag oil project (COP), 6-billion dollar in capital investment Key Responsibilities: *Work with the Contractor and the AIOC team to deliver fully on BP's expectations on HSE *Responsible for managing and coordinating contractors in all aspects of site activities. *Responsible for ensuring contractor and contractor's employees have the information to carry out task risk assessments for work to be done. *Ensure contractor is completing the work in accordance with COP project and BP drawings and technical specifications. *Monitor and guide the Contractor on Mechanical equipment installation, Mechanical Completion and preservation activities. Inspection of mechanical packages when received at site. Including a detailed damage inspection and P&ID walk downs of the packages. *Carry out inspection of mechanical and HVAC equipment at the Hold and Witness points identified within the Inspection & Test Plans. *Review of any work transfer from package release and communicating detailed work scopes to contractor. *Ensure that the Contractor adheres to the Project specifications and procedures. *Review of contractor supplied procedures and Red line drawings. *Take a lead role in the promotion of safe working practices and ensure that the site safety initiatives and procedures are being applied. *Take part in meetings with the numerous interface groups and contribute to a common approach to complete the Works. *Interface with the Drilling Facilities, contractors, subcontractors & Completions group. *Interface with commissioning, operations group & Start up Team. *Interface with other engineering disciplines and project support groups, KBR, QA, Materials, IT, Commercial, Safety and planning as necessary. *Coach and train National AIOC Mechanical personnel, and ensure that they are provided opportunities to attend. Review the performance of Contractors personnel undergoing trade training, and ensure that the competency assessment process is rigorously implemented.
January 2009January 2011
2 years 1 month
AZMECO

Azerbaijan, www.azmeco.com/

Industrial Equipment, Machine Tools and Components... Show more

Lead construction mechanical engineer
employed by Position: Lead Mechanical engineer, construction team Project: Methanol Petrochemical Industrial Plant Project, Azerbaijan Key Responsibilities: * Supervising and control over subcontractor companies works on installation of plant vertical methanol tanks, warehouse buildings, methanol control buildings, auxillary boilers under the set procedures and standards. ;
January 2008January 2009
1 year 1 month
Swift Technical

Azerbaijan, www.bp.com/en_az/caspian/operationsprojects/terminals/sangachalterminal.html

Mechanical commissioning supervisor
Project: Sangachal Terminal Expansion Project (STEP), Azerbaijan Key Responsibilities: * Planning & supervising daily work schedule for team of multinational Mechanical commissioning technician. * Carrying out inspection; pre-commissioning & commissioning activities, equipments to achieve Mechanical completion & handover to commissioning. * Compilation of; punch list, commissioning test records. * Liaison with vendor. ; * Carrying out; Calibration, function testing, built amendments to drawing. ;
January 2007January 2008
1 year 1 month
BP

Azerbaijan, www.bp.com/en_az/caspian/operationsprojects/ACG.html

Mechanical commissioning technician offshore
Project: Deepwater Gunashli (DWG) of the ACG field in the Azerbaijan sector of the Caspian Sea Key Responsibilities: * Dynamic commissioning of equipments for main power generation, chemical injection system, waste recovery cooling/heating medium and close drain system. * Dynamic commissioning of WEIR oil booster pump, main oil pump, lean amine pump, water injection system, glycol re-boiler. * Test run of mechanical equipments and ensure normal operating parameters. * Inspection of mechanical system using piping and instrument diagram. * Interpret job card requirements, plan the work, organize equipment, materials and work permit. Carry out general inspections and mechanical preservation work within the equipment such as centrifugal pumps, chemical injection packages, vessels, compressors, heaters, valves as per check sheets and attached procedure. * Identify punch listing of equipments with the aid of piping and instrument diagram. * Complete tasks, defects sheets, and provide written report as required. * Assist in all areas of field operations; maintain clean and tidy work area during and after completion of work. ;
January 2004January 2007
3 years 1 month

Azerbaijan, www.subseaiq.com/data/PrintProject.aspx?project_id=273&AspxAutoDetectCookieSupport=1

Mechanical commissioning technician
Project: ACG project, West & East Azeri 48-slot PDQ platforms Key Responsibilities: * Carrying out inspection; pre-commissioning & commissioning activities, equipments to achieve Mechanical completion & handover to commissioning. * Conducting all mechanical work activities. ; * Preparing & planning all mechanical work scope. ;

Skills

Skill proficiency levels
Google Chrome
Microsoft Access
1С: Предприятие
Driving Licence B
MS Excel
MS Outlook
Adobe Photoshop
Английский язык
1С: Предприятие 8
Internet
MS PowerPoint
Управление отношениями с клиентами
Project management
Пользователь ПК
Управление персоналом
Организаторские навыки
Работа в команде
Деловая переписка
Ведение переговоров
Точность и внимательность к деталям
Business Planning
Обучение персонала
Проведение презентаций

About me

•Ability to interpret and understand P&IDs, D&IDs, UFDs, PFDs, GA’s and other engineering drawings. •Mark up PUNs on issued drawings •Good knowledge of Mechanical and HVAC package equipment. •Ability to work on own initiative. •Good inter-personal skills. •Ability to produce written reports. •Computer literate in MS Word, MS Excel and MS PowerPoint

Higher education (bachelor)

1998
Higher education (bachelor)
Azerbaijan Architecture and Construction University
Mechanical (water supply, sewerage, water bodies’ protection and resources conservation), Engineering Systems & Construction

Languages

Azerbaijani — Native

English — B2 — Upper Intermediate

Russian — C2 — Proficiency

Turkish — C2 — Proficiency

Citizenship, travel time to work

Citizenship: Azerbaijan

Permission to work: Azerbaijan

Desired travel time to work: Up to one hour