Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online yesterday at 22:16

Candidate

Male, 42 years, born on 1 July 1982

Actively searching for a job

Uralsk, willing to relocate (Other regions, Kazakhstan, Kyrgyzstan, Russia, Uzbekistan, Ukraine), prepared for business trips

The approximate area of the job search is specified

Project Control/Quantity Surveyor / Cost Control/Contract Administrator

1 $ in hand

Specializations:
  • Other

Employment: full time, part time, project work

Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work

Work experience 15 years 2 months

May 2021September 2023
2 years 5 months
The employers have been hidden by the job seeker

Construction, Real Estate, Architecture... Show more

Senior Quantity Surveyor (verification field Team)
Future Growth Project 3rd Generation Plant (3GP) Tengiz Field. Kazakhstan Verification field Team. Working in a multi-disciplinary MEI project, performing detailed measurement and review of Contractor measures in line with the contract preamble method of measurement and schedule of rates. • Measurement of Structural Steelwork from AFC drawings using industry standard specifications. • Measurement of pipework inclusive of pipe, valves, fittings, painting, Heat tracing and Insulation from Isometrics and other specifications. • Detailed analysis of pipe supports weights and painting surfaces. • EIT Cabling classification from specifications to align with the schedule of rates. • Measurement of Electrical, Instrumentation, Telecommunications and Fire & Gas from AFC drawings and documents. • Thoroughly evaluating Contractor measures and identify overclaimed items and/or mistakes. • Liaising with other departments such as Engineering, Contracts and Progress Payment. • On site verification of Contractor claimed installed quantities including validation of field run installations. Reconciliation Team. • Viewing Contractor’s BOQs against AFC drawings, CWEs and AWE. • Compare Contraction red lines drawing (additional work) with actual s
December 2019May 2021
1 year 6 months
The employers have been hidden by the job seeker

Construction, Real Estate, Architecture... Show more

Project Control/Planning Engineer
Turnaround Maintenance Modification projects. Tengiz Field Kazakhstan. • Acquaintance with project documentation (Drawings, job packs & etc.). • Preparation of work breakdown activities by stages. • Preparation of schedules in accordance with approved scope of work. • Preparation of spreadsheets for construction with physical scope. • Key milestones identification for tracking project. • Preparation of weekly and monthly reports for Project Department.
July 2019May 2021
1 year 11 months
The employers have been hidden by the job seeker
Cost Engineer
Turnaround Maintenance Modification projects. Location Kazakhstan Tengiz Field. • Work in Ariba system. • Preparation of estimates and costs of the work (Mech, Scaff, Elect. Instrument). • Preparation and submit invoicing/progress claims. • Manage the tracking of costs for all reimbursable work. • Prepare invoices to the client for charges to the contract. • Work with Quantity Surveyors team to evaluate and obtain site approvals of invoices from all construction work. • Preparing monthly cost & cash flow reports.
April 2018May 2019
1 year 2 months
The employers have been hidden by the job seeker

Construction, Real Estate, Architecture... Show more

Cost Engineer
• Close work with Quantity Surveyor Team to evaluate and obtain site approvals of invoices from all construction discipline (Civil, Mechanical, E&I). • Checking estimates measures from contractor on the tendering phase assistance to Engineering department. • Prepare, control and update Cost control filing system. • Prepare new procedure for contracts invoices and documents flow. • Checking and approve timesheets and payment documentation on monthly basis. • Checking and preparing Purchase Orders for services contracts for all contractors. • Preparing cost analysis and contract reconciliation for Final account. • Close out the contract (Additional Agreements) issue required documentation and work with Contracts group.
November 2017March 2018
5 months
The employers have been hidden by the job seeker

Construction, Real Estate, Architecture... Show more

Cost Engineer
Remedial Works to Improve Plant Integrity. Unit-2 Re-Injection Gas to Re-Injection Compressors Sample Return to LP Flare • Monitor each project value of Work Done (VOWD) against with Approval for Expenditure (AFE) • Assist to lead Engineer in areas in such as cost / financial analysis. • Prepared financial forecast for project in middle month for each month. • Process and code invoices in accordance with corporate procedure, SAP requirements. • Prepare, control and update Cost control filing system. • Prepare new procedure for contracts invoices and documents flow. • Checking and approve timesheets and payment documentation on monthly basis.
August 2013November 2017
4 years 4 months
The employers have been hidden by the job seeker

Transportation, Logistics, Warehousing, International Logistics... Show more

Cost & Contract Administrator
• Cost Analysis of the discipline and Contractors monthly and other periodic cost. • Regular approved contract value (ACV) and Budget performance reports to Contract Holder. • Record of all correspondences, meetings, actions, and decisions relating to the Contract. • Assist to Contract Holder in developing contract / commercial strategies and plans. • Feedback reports for Contractor assessment. • Correction and timely processing invoices including raising of Service Entries and Call-Off’s. • Work in SAP system. • SAP purchase requisitions for tenders, single and sole source contract awards, and extensions. • Monitor the payment certificate process, liaising with the accounting group. • Preparation of notices and Payment Certificates, processing contractor’s invoices and variation orders for approval. • Track expenditure against Contract, approved limits and advising Contract Holders for approval required Docs. • Performing Contract to Close Out.
April 2010August 2013
3 years 5 months
The employers have been hidden by the job seeker

Construction, Real Estate, Architecture... Show more

Site Quantity Surveyor
Location Kashagan offshore Oil field, Kazakhstan • Multi-discipline Quantity Surveyor, Civil (excavation, tranche work, concrete/foundation) Mechanical (Installation of scaffolding, welding and erection of pipelines, spools and pipe supports, steel structures) E&I/Telecom (cable pulling, cable trays/ladders/rack, trace heating, telecom/E&I devices/panels installation, hydro testing, Insulation, painting) • Planning and conduction of site verification of Contractors’ installed quantities. Proper records of verification activities, walkdowns / spot checks and reviews of Contractor reported progress. • Joint walkdown with Contractor on site to review weekly progress prior to submission.
March 2007December 2007
10 months
The employers have been hidden by the job seeker

Construction, Real Estate, Architecture... Show more

Technician for Standardization
Perform work on standardization, their timely preparation for reissue, provision of departments with necessary documents on standardization and certification, information on the availability of standards, their changes and cancellation, on registration of requests for third-party standards received from outside organizations
September 2005July 2006
11 months
The employers have been hidden by the job seeker

Industrial Equipment, Machine Tools and Components... Show more

Operator of the production line
Operation of production line producing plastic pipes different diameters, commissioning and installation of equipment, operation of cooling system, the pumps, replacement of valves, support operating temperature of production line

Skills

Skill proficiency levels
Communicative, neat, responsible

Driving experience

Own car

Driver's license category A, B

About me

Knowledge technology of process for the primary conversion oil and gas, principle operations of compressor, pump, valves and other equipment use in gas and oil industry. HSE rules Was included on constant base to Duty Emergency Responsible Team. BOSIET training H2S training Confine Space Training Future Growth Project Recognition Bronze (medal) Award Recognition Certificate-using Stop Work Authority rule to suspend the work.

Secondary special education

2010
Oil & Gas industry, Technical Course two years (Process Design Engineer)
2005
Oil & Gas, Design, construction and operation of gas and oil pipelines and gas and oil storage facilities
2002
College of the Gas to Oils and branch Technology
Oil & Gas, Construction and operation of gas and oil pipelines and gas and oil storage facilities

Languages

KazakhNative


EnglishB2 — Upper Intermediate


RussianC2 — Proficiency


Professional development, courses

2013
BOSIET
Yeskertkish Kyzmet Kazakhstan, Курс выживания на море

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter